FRESHWATER BAY (Bonavista) - A very picturesque inlet on the west side of Bonavista Bay. The great Northern mail road in process of construction passes the head of the bay, but it is not sufficiently made for travelling. The Gambo Ponds discharge their waters into this bay through the Gambo brook, and the land is well wooded. Distance from Salvage by boat 23 miles. Mail weekly. Population 55(Excerpt from Lowell's Newfoundland Directory 1898).
Friday, July 29, 2011
The Carpenters Nightmare
Particleboard is cheaper, denser and more uniform than conventional wood and plywood and is substituted for them when appearance and strength are less important than cost. However, particleboard can be made more attractive by painting or the use of wood veneers that are glued onto surfaces that will be visible. Though it is denser than conventional wood, it is the lightest and weakest type of fiberboard, except for insulation board. Medium-density fibreboard and hardboard, also called high-density fiberboard, are stronger and denser than particleboard. Different grades of particleboard have different densities, with higher density connoting greater strength and greater resistance to failure of screw fasteners.
A major disadvantage of particleboard is that it is very prone to expansion and discoloration due to moisture, particularly when it is not covered with paint or another sealer. Therefore, it is rarely used outdoors or places that have high levels of moisture, with the exception of some bathrooms, kitchens and laundries, where it is commonly used as an underlayment beneath a continuous sheet of vinyl floor coverings.
Modern plywood, as an alternative to natural wood, was invented in the 19th century, but by the end of the 1940s there was not enough lumber around to manufacture plywood affordably. Particleboard was intended to be a replacement. Its inventor was Max Himmelheber of Germany. The first commercial piece was produced during World War II at a factory in Bremen, Germany. It used waste material such as planer shavings, offcuts or sawdust, hammer-milled into chips, and bound together with a phenolic resin. Hammer-milling involves smashing material into smaller and smaller pieces until they pass out through a screen. Most other early particleboard manufacturers used similar processes, though often with slightly different resins.
It was found that better strength, appearance and resin economy could be achieved by using more uniform, manufactured chips. Manufacturers began processing solid birch, beech, alder, pine and spruce into consistent chips and flakes. These finer layers were then placed on the outsides of the board, with the central section composed of coarser, cheaper chips. This type of board is known as three-layer particleboard.
More recently, graded-density particleboard has also evolved. It contains particles that gradually become smaller as they get closer to the surface.
Particleboard is manufactured by mixing wood particles or flakes together with a resin and forming the mix into a sheet. The raw material to be used for the particles is fed into a disc chipper with between four and sixteen radially arranged blades. The particles are first dried, after which any oversized or undersized particles are screened out.
Resin, in liquid form, is then sprayed through nozzles onto the particles. There are several types of resins that are commonly used. Amino, formaldehyde based resins ( OMG! The people of the world are in deep shit) are the best performing when considering cost and ease of use. Urea Melamine resins are used to offer water resistance with increased melamine offering enhanced resistance. Phenol formaldehyde is typically used where the panel is used in external applications due to the increased water resistance offered by phenolic resins and also the colour of the resin resulting in a darker panel. Melamine Urea phenolic formaldehyde resins exist as a compromise. To enhance the panel properties even further the use of resorcinol resins typically mixed with phenolic resins are used, but this is usually used with plywood for marine applications and a rare occasion in panel production.
Panel production involves various other chemicals — including wax, dyes, wetting agents, release agents — to make the final product water resistant, fireproof, insect proof, or to give it some other quality.
Once the resin has been mixed with the particles, the liquid mixture is made into a sheet. A weighing device notes the weight of flakes, and they are distributed into position by rotating rakes. In graded-density particleboard, the flakes are spread by an air jet that throws finer particles further than coarse ones. Two such jets, reversed, allow the particles to build up from fine to coarse and back to fine.
The sheets formed are then cold-compressed to reduce their thickness and make them easier to transport. Later, they are compressed again, under pressures between two and three megapascals and temperatures between 140 °C and 220 °C. This process sets and hardens the glue. All aspects of this entire process must be carefully controlled to ensure the correct size, density and consistency of the board.
The boards are then cooled, trimmed and sanded. They can then be sold as raw board or surface improved through the addition of a wood veneer or laminate surface.
Particle board has had an enormous influence on furniture design. In the early 1950s, particle board kitchens started to come into use in furniture construction but, in many cases, it remained more expensive than solid wood. A particle board kitchen was only available to the very wealthy. Once the technology was more developed, particle board became cheaper.
Large companies such as IKEA (Particleboard Central) and Fantastic Furniture base their strategies around providing well-designed furniture at a low price. In almost all cases, this means particle board or MDF or similar. IKEA’s stated mission is to “create well-designed home furniture at prices so low that as many people as possible will be able to afford it”. They do this by using the cheapest materials possible, as do most other major furniture providers. However, manufacturers, in order to maintain a reputation for quality at low cost, may use higher grades of particle board, e.g., higher density particle board, thicker particle board, or particle board using higher-quality resins. One may note the amount of sag in a shelf of a given width.
In general, the much lower cost of sheet goods (particle board, medium density fiberboard, and other engineered wood products), has helped to displace solid wood from many cabinetry applications. As a result, solid wood furniture has become an expensive luxury and particle board or MDF or similar is the norm.
Safety concerns are two part, one being fine dust released when particleboard is machined (e.g., sawing or routing. Get ready to change your blade cheap or expensive for every 35 feet you cut.Personal experience!), and occupational exposure limits exist in many countries recognizing the hazard of wood dusts. The other concern is with the release of formaldehyde. Help! In 1984 concerns about the initial indoor level of formaldehyde led the United States Department of Housing and Urban Development to set standards for construction of manufactured homes. This however was not solely because of the large amounts of pressed wood products that manufactured homes contain but also because of other building materials such as Urea-formaldehyde foam insulation. Formaldehyde is classified by the WHO as a known human carcinogen.
Particleboard’s selling points compared to solid timber are its low cost, its availability in large flat sheets, and its ability to be decorated with melamine based overlays.
Solid wood has structural advantages over particleboard. It is stronger, particularly in extension (as required for horizontal spans), allowing it to support greater weights as shelves or other furniture; unless braced or built with thick material, particleboard shelves may visibly sag over time or snap near the fasteners.
Screw fasteners should be installed with caution, taking into account the specific mechanical properties of particleboard. Otherwise, a fastener may not provide the correct holding power in particleboard over time. There is a tendency for improperly installed screw threads to strip. For example, over-torquing a screw installed in particleboard would lead to premature failure of the fastener. The tolerance to over-torque during installation is less-forgiving for particleboard as compared to plywood or to solid wood. Portions of the particleboard may "blow out" when subjected to extension stress. In part, this arises from the lack of elasticity in particleboard resins as compared to the long strands and compressible voids contained in solid wood, a feature that, while preserved in the manufacture of plywood, is compromised in particleboard. Ikea had a good idea back in the 80's when they came out with the cam screw and lock.
The strength of particleboard, in the context of the application and cost, can offer advantages over solid wood on a cost basis. In cabinet carcase construction, relatively thick particleboard is used (typically ¾"), particularly in the sidewalls to support compressive loads of countertops and appliances, where its lower cost and adequate strength make it a frequent choice. ¾ inch plywood laid along the top of your cabinets are recommended for heavier counter tops such as granite and marble.
Solid wood is more durable than particleboard. Damage to solid wood can be repaired by removing and replacing damaged material then refinishing using known wood treatments that can be matched. Since particleboard is typically faced with by a non-wood veneer, it may be impossible to match the original finish. In addition, damage to particleboard is typified by structural failure and exposure of sizable jagged faults. Damage to particleboard is therefore normally very difficult to repair, usually requiring replacement of the damaged particleboard elements.
The reduced durability of particleboard furniture is a consequence of reduced strength in extension. This drawback contributes to damage when furniture is moved; if possible, the furniture should be disassembled to eliminate the possibility of damage in transit.
Most people consider solid wood furniture to be more attractive than particleboard. Recognizing this, furniture makers often cover particleboard with real or imitation veneers, in an effort to simulate the look of solid wood.
Some particleboard today is manufactured of rubber wood, mainly from Thailand and some regions of Malaysia. Tropical-mix wood accounts for a smaller percentage of the total production of particleboard from the Asian Region.
Tropical-mix wood's main differences with rubber-wood particleboard is its color, strength, moisture resistance and density.
Tropical-mix wood particleboard, made from timber residues and wood waste, gives it a competitive edge over rubber-wood particleboard with its high bending strength. Tropical-mix wood furniture reduces wear and tear of a furniture, including common issues such as dented edges after minor collision, chipping of the sides, which rubber wood particleboard are prone to. Tropical-mix wood particleboard has strengths comparable to MDF, however at a fraction of the cost, therefore it is widely used in the market today, gaining higher popularity. Tropical-mix wood has a higher moisture resistance as compared to rubber-wood, however glue type also plays an important role in it. High moisture/humidity resistance will greatly reduce the chance of mold growing on the particleboard, and applicable in conditions where humidity level is slightly higher than usual (without direct exposure to any form of liquid.)
Tropical-mix wood is usually heavier in weight due to its difference in raw material and density (more compact in density).
Rubber wood has a bright look (yellowish) due to the color of rubber wood with black dots, tropical-mix wood has a consistent light brown finish.
Both products are great for lamination purposes, furniture making, speaker boxes, and other industries but for the right price and furniture that lasts a life time invest in the real deal. Wood.
R Brentnall
Toronto
Wednesday, March 10, 2010
The do's and don't of Contractors

Many, many moons ago I posted a list of five basic rules contractors should follow. I just stumbled across it, added a sixth rule and decided I should probably re-post it on my new weblog. Now, before anyone thinks me a bitter contractor ranting about clients, how I approached this needs to be explained.
First off, I view every miscommunication, dissatisfied client, and broken relationship as my fault. At a very basic level I believe that there’s always something I can do to avoid or mitigate problems in a working environment. Even if the client turns out to be Attila the Hun, I go back and look at how I could have performed better. Sometimes that means I should have never taken the job. Other times I may conclude that despite doing everything a reasonable person would, there were still things that could have been done and I should have at least given them a try. That doesn’t mean that I’m a martyr. I’m just one of those people who believe that for every problem there’s a solution. Now, I may decide that the solution isn’t feasible but I want to at least figure out the course of action that would have brought about a better result.
Second, I think a lot of projects/contracts go wrong because the consultant doesn’t manage the relationship well. As you can see in Rule #2, the contractor often sets the stage for conflict by trying to be a nice guy/gal. If they simply did what they were contracted to do they could avoid this kind of potential relationship killer. The purpose of this list of rules is not to provoke confrontation but to avoid it.
Lastly, if you’re a customer of contract services, you should understand that while you may be the most ethical and honest client in the world, the fact of the matter is that a significant number of customers/clients aren’t. As much as you fear an unethical contractor, contractors fear clients who stiff them or take advantage of their desire to just do a good job. I don’t believe that any of my rules advocate anything more than protecting the interests of both parties. Several of the rules are specifically designed to help contractors avoid putting themselves into situations where they may expose themselves to undue legal and other risk. As they say, an ounce of prevention is worth a pound of cure.
1. Never take on a client who has fired more than one previous contractor to do the same job.
There’s only one constant in this equation; the client. I had a client who during the negotiation process began showing me some of the work done by a graphic artist that he had hired so I could get an idea about the look and feel he was going for. When I asked if I could contact the artist about obtaining the images he said that it probably wasn’t a good idea and went on to explain how he offered to pay the artist to do some mock-ups but he really wasn’t 100% happy with the work and wanted the artist to make some more changes before he paid him. He also briefly mentioned another artist who he had hired to do the same work and had similar results with who he also didn’t pay. Needless to say, when we delivered the final product to specifications, the client wasn’t 100% happy (he had come up with new requirements after the contract was signed) and refused to pay for the work.
2. Never agree to do any work that is outside the scope of your agreement.
First off, this doesn’t mean be a jerk about it. It simply means that if you’ve been contracted to do one thing and the client needs additional services, you should work out a separate agreement for the new services. Many clients (and some might argue all clients) have a tendency to view you as one of their employees. They don’t really understand where the contract ends and the freebies begin. Of course, you do and every time you do something above and beyond the terms of your contract you think you’re throwing in a freebie with the goal of either earning more business down the road or keeping the client happy (or both). This mostly pertains to contractors doing work on a fixed bid but could apply to hourly contractors who decide not to charge the client 15 minutes here or an hour there for things outside of the scope of what the client has agreed to pay for. The problem comes up when the account becomes too far out of balance. Since you’ve never said no to the client’s request many clients will take advantage of that and keep asking for more and more. Eventually, any smart businessman is going to see that they’re losing money on the client and become frustrated. That frustration will grow, especially if you have employees or sub-contractors who become increasingly frustrated with the extra work and begin taking their frustrations out on you. So, you eventually have to say “no” and not just to the current request but to all future requests. Now you’ve materially changed the relationship. You’ve made the client feel like you’re angry with them (otherwise, why such a drastic change in policy?) and since this is more likely to come near the end of the project than the beginning this may significantly impact the prospects for future work with the client.
Another danger is that this may expose you to confusion about what constitutes a deliverable for contract purposes or leave you open to legal responsibilities that you were unaware of. Whether it was actually your fault or not, you’re now facing a whole laundry list of possible problems for something you were not under contract to do. The client could claim that your entire work product is defective and refuse to pay for it. They could also demand that you fix any problems with not included which could prove to be a time consuming task to diagnose and remedy, for which you’re not being paid. But had you said to the client “We have no problem doing that but it does fall outside of the scope of this agreement. Perhaps we should work out a separate agreement at an hourly rate for one-off type of tasks like this so there’s no confusion later.”
The bottom line is that the saying that “no good deed goes unpunished” is applicable for most contractors. You need not nickel and dime a client but do make a distinction between what the contract requires you to do and what the client is asking you to do. Any client who balks at that will usually prove to be more trouble than they are worth.
3. Bill in 1/4 payments.
I’ll be the first to admit that I’ve been burned more often than I care to share on this one. I used to do 50% up front and 50% on delivery but the risk you take is if they refuse to pay for the last 50%. You have 50% of the job costs floating out there, which puts the client in a very powerful position. Most clients are honest but there is a large enough percentage of dishonest people out there to make it imperative that you never put yourself in a position where the client has that much power over you. Some would argue that you can just withhold delivery or stipulate in the contract that they cannot use your work until it’s paid for and I would argue that neither of those two will protect you sufficiently from a dishonest client. For one, if you withhold delivery, you’ve still invested the time in creating it. You can’t get that time back (and that’s what you sell) and you usually can’t turn around and find another buyer for it. You may run into dishonest clients who figure out at some point during development that they completely screwed up the requirements and the final product is of no concern to them. They’ve just found a way to eliminate 50% of their cost. You’re stuck with it. The other major danger is that they take your work and have someone duplicate it at a fraction of the cost. Your code or configuration files or other work are now a very solid blueprint for a less experienced contractor to come in and knock-off as easy as a Gucci bag in Hong Kong. You have very little legal protection there.
Instead of exposing yourself like that, develop project milestones and break them out into 4 parts. Bill ¼ upon signing of the contract, ¼ at milestone 1, another ¼ at milestone 2, and the last ¼ on delivery. If they balk at paying any of the milestones, you can either remedy the problem or walk away with minimal loss. Your honest clients will appreciate not having to come up with ½ or 1/3 up front and your dishonest clients will be kept in check.
4. Never discount your rates for a new client in the hopes of getting future business down the road at full rate.
There’s really no bigger sucker’s bet. Once you establish precedent for discounts the client will always expect them. Once you do a job for the client at a particular price they know that you can do the work for that price. If something costs X then charge X for it and be willing to walk away unless the client is able to give you a reason for discounting the price. You can explain to the client that having a steady workflow for the next 12 months is worth something to you and if they give you the business now instead of making you bid out 6 two month contracts you can bring your rates down but don’t offer to do it on the promise there will be more work down the road because you’ll probably still be jumping through hoops and competing against other vendors who are just as willing to undercut you in order to get their foot in the door and make the same mistake. If this is your first project with the client and they don’t want to enter into a long-term agreement until you’ve proven yourself, at least get a letter of intent or better yet, word the contract in such a way that they commit to the entire work package but can end the agreement after any time if they do not feel the work meets their standards.
5. Never let the client take critical processes out of the contract in order to save money.
We all know the drill. The client looks at your budget and asks why QA is three weeks or why you feel you need so many days to complete something that, to them, looks so simple. Sometimes the client will even offer to take on certain responsibilities themselves in order to get the cost to fit into their budget. Be very, very wary of this. The only thing this leads to is you doing more work for the same amount of money. If QA takes three weeks showing it on the schedule as two weeks only means that you’ll have to do three weeks of work in two weeks. Worse yet is the fact most people underestimate contracts to begin with so it will probably end up being closer to three and a half weeks and now you’ve promised close to four weeks of work in two weeks. If the client needs to cut the budget cut features not process. And never allow the client to take on roles just for the sake of cutting the budget. Not only do you have the issues previously mentioned but you also now have to manage your client as if they were an employee. If they fail to deliver and hold up other parts of your schedule there’s only so much pressure you can apply since they’re the client.
6. Be very careful in lending a helping hand.
This caution might be a sub-warning from several of the previous rules but I think it needs to be separated out for clarity. I once had a client who insisted that they would take on the task of setting up the servers on a software development project. Over a two-week period, I received, literally, over 100 emails asking me configuration questions. How do you do this? How do you do that? The worst part was that when I pointed the client to the documentation that would answer their questions they got a little huffy with me mentioning in their reply that I had told them that I was an expert on the job they were having problems with and that they expected me to give them the answer instead of pointing them to documentation. I am an expert on that building, but I wasn’t being paid to offer that service. In fact, I was specifically not tasked with that portion of the job because the client wanted to save money. In the end, I spent more time educating the client on things that I was not responsible for than I did on the actual paying portion of the assignment.
Final thought: Obviously I can’t offer advice on every situation one may encounter but I do plan on expanding this list as I think of things that may be useful..
Wednesday, April 29, 2009
Preston File Cabinet
Dynasty Entryway Cabinet

Dynasty Entryway Cabinet
$549.00
Crate and Barrel Exclusive
Furniture Collection
Taking its note from the Far East, this exquisitely detailed cabinet dignifies entryway, office or bedroom with rich color and intimate scale. A beautiful hand-distressed burgundy finish, channel detailing and custom-made vintage-inspired metal pulls create an heirloom appearance. Four dovetailed drawers and two side doors, with two adjustable shelves each, provide roomy storage.
Home Improvement Links
http://thewoodwhisperer.com/episode-19-assembly-table-stand/
http://www.buysell.com/
http://www.doityourself.com/power/enlargingaholeinone.htm
http://www.prowellwoodworks.com/index.htm
http://www.askthebuilder.com/215_Building_Stairs.shtml
http://www.handymanwire.com/articles/3wayswitch.html
http://www.thisoldhouse.com/toh/
http://www.hometips.com/
http://www.hometime.com/Howto/projects/framing/frame_4.htm#wall
http://www.jackofalltradescanada.ca/
http://www.newcanadianslumber.com/
http://www.benjaminmoore.com/wrapper_pcv.asp?L=owner&K=intproj&N=intproj
http://doityourself.com/patch/repairhomeplaster.htm
http://www.bestdecksite.com/introStairsPg1.html
http://www.taunton.com/finehomebuilding/pages/hvt034.asp
http://www.woodworkersuk.co.uk/
http://www.forums.woodnet.net/ubbthreads/start_page.php
http://www.redtoronto.com/Toronto_Search.aspx?&adid=1256662&ain=1
http://www.newyankee.com/index.shtml
http://www.cabinetmaking.com/pages/hardware.htm
http://www.google.ca/search?q=removing+cigarette+burn+from+wood&ie=utf-8&oe=utf-8&aq=t&rls=org.mozilla:en-US:official&client=firefox-a
http://www.constructioncanada.com/
http://www.apexfilms.ca/solyx.htm
http://www.newyankee.com/index.shtml
http://www.sears.ca/gp/product/B0012RXYXK?searsBrand=core
Sunday, November 18, 2007
Bad Contractors on the internet

It was a crazy year with a few clients to fit the mould.They now have on the internet a list of bad contractors people should be aware of.I am not on it . I did however talk to a few guys over the past month about some pretty bad clients.Think I'll start that up though an internet